1. The upper reinforcement cage and the lower reinforcement cage are positioned to be installed
2 connect the reinforcement cage with a connecting wrench at the same time
3. After connection, prepare to bind stirrups
4. Acceptance after connection. The whole connection process has 16 connection nodes and 3 rebar workers, which takes 8 minutes to complete. All double screw sleeve connections can meet the requirements of on-site cutting!
Prefabrication of reinforcement cage and pre installation of double screw sleeve
Hoisting alignment
Connection installation
Connection complete
Specimen interception
Broken base metal